Description
Constructing a Community Integrated Product System (CIPS) from Subscenarios.

Step 4
Select & Modify most promising Sub Scenarios as a Team employing SC Design Subscenario Matrix technique.

SC Design SUBS-TOOL

SC Design SUBS-TOOL as employed by SODYCO

SC Design SUBS-TOOL as emplyed by HOPE

Generating and selecting Subscenario features applying the SC Design SUBS-TOOL.

Most promising Subscenarios are selected.
Step 5
Co-Value Sub Scenarios with Actors and Client. Apply Harris Profile Methodology.
In case of a concrete context (Coffee case 2010-2011) Q methdology may be applied to measure perception of most promising subscenarios by actors.

Harris Profile Methodology
To improve the visuality of the Harris Profile, the SC Design Harris Profile represents criteria weight factors graphically as well in the diagram. See under.

Improved graphical representation of Harris profile
Step 6
Construct Community Integrated Product System (CIPS), based on most promising Sub scenarios.
Deliverables i-2
- Concept for CIPS in 3D CAD drawings.
- Draft Report i-2.
- PPT Presentation / 7 Minute Pitch

C.I.P.S for Pedal Power Lighting / CASE 2009-2010

Das Ding ‘an sich’ / CASE 2009-2010

Including Community Elements into a Community Integrated Product System to enhance Social Cohesion / CASE 2009-2010

PPT Presentation / CASE 2009-2010